Court Craft flew to Fiji to resurface the Yasawa Island Resort and Spa Tennis Court. Two crewmembers completed the works with local tradesmen. All materials and tools had to be shipped from Sydney to Fiji.

  • Resort staff removes grass and pressure wash slab.
  • Resort staff as much as possible scrape off the loose glue and if possible hire a floor grinder and grind the Court.
  • All options the resort is to collect materials from Lautoka, materials will typically be packed on 1t pallets, synthetic grass rolls will be 250kg x
    3.72m and approx 8. Could be 11 t to transport to the island on barge, load and unload by forklift and move to the court.
  • Supply and Install Acrylic Hard Court Surface.